Results >> Deliverables

Deliverables

Year 1

Year 2

Year 3

Year 4

Year 1
Del no Deliverable Name WP no Nature Dissemination level Delivery date Actual /Forecast delivery date Status/ Not submitted Contractual Yes/No Comments
D1.1 AIDA website and Intranet operational 1 O PU M02 31/03/11
M02
Submitted Yes Report available here
D2.1 Project web infrastructure to document software packages 2 O PU M03 30/04/11
M03
Submitted Yes Report available here
D2.2 Central code repositories and other infrastructure required for the software development 2 O PP M04 31/05/11
M04
Submitted Yes Report available on intranet to project members only
D2.3 Software design for geometry toolkit including the interfaces for the reconstruction toolkits 2 R PU M12 02/08/12
M19
Submitted Yes Report available here
D2.4 Software design for tracking toolkit 2 R PU M12 06/06/12
M17
Submitted Yes Report available here
D2.5 Software design for PFA tools 2 R PU M12 13/03/12
M14
Submitted Yes Report available here
D3.1 Organisation of the 3D production 3 R PU M12 13/03/12
M14
Submitted Yes Report available here
D8.1 Experience at LHC and definition of test programme 8 R PU M12 27/07/12
M18
Submitted  Yes Report available here
Year 2
Del no Deliverable Name WP no Nature Dissemination level Delivery date Actual /Forecast delivery date Status/ Not submitted Contractual Yes/No Comments
D2.6 Design for handling the pile-up in sLHC 2 R PU M17 15/10/2013
M33
Submitted Yes Report available here
D3.2 Availability of wafers of ASIC electronics 3 R PP M17 24/08/12
M19
Submitted Yes Report available here
D3.3 Production of dedicated sensors 3 R PP M17 24/08/12
M19
Submitted Yes Report available here
D1.2 1st Periodic Report (progress of work, resources, finance) 1 R RE M20 31/10/2012
M21
Submitted Yes Report available here
D8.2 Publication of specification documents for the DAQ and for the central documentation facilities 8 R PU M20  26/08/2013
EDMS(M31)
28/02/2014
DAQ (M37)
Submitted Yes Reasons for delay available here
Report EDMS
Report DAQ
D3.4 1st set of macro blocks 3 R PU M22 M37 Delayed Yes Reasons for delay available here
Year 3
Del no Deliverable Name WP no Nature Dissemination level Delivery date Actual /Forecast delivery date Status/ Not submitted Contractual Yes/No Comments
D3.5 Wafer post processing (thinning, TSV) 3 D PP M25 27/05/2013
M28
Submitted Yes Report available here
D8.3 Design study on low energy beamline 8 R PU M26 18/11/2013
M34
Submitted Yes Report available here
D3.6 Component processing 3 R PU M29 15/10/2013
M33
Submitted Yes Report available here
D9.1 Infrastructure for thermo-mechanical measurements 9 O PU M33 26/03/2014
M38
Submitted Yes Report available here
D9.2 MPGD development infrastructure 9 O PU M34 26/03/2014
M38
Submitted Yes Report available here
D3.7 Test interconnection and evaluation 3 R PP M36 28/02/2014 M37 Submitted Yes Report available here
D4.1 Overall industry relation report 4 R PU M36 M42 Delayed Yes Reasons for delay available here
Year 4
Del no Deliverable Name WP no Nature Dissemination level Delivery date Actual /Forecast delivery date Status/ Not submitted Contractual Yes/No Comments
D8.4 Upgrade scenarios for irradiation lines 8 R PU M37        
D9.3 Large TPC infrastructure 9 O PU M37        
D9.4 Integrated Telescope arm 9 O PU M37        
D1.3 2nd Periodic Report (progress of work, resources, finance) 1 R RE M38 11/04/2014
M39
Submitted Yes Report available here
D2.7 Software toolkit for detector geometry, materials and detection technologies 2 O PU M38        
D2.8 Software toolkit with tracking algorithms 2 O PU M38        
D2.9 Particle Flow software tools 2 O PU M38        
D2.10 Alignment tools software tools 2 O PU M38        
D2.11 Trigger simulation software tool 2 O PU M38        
D9.5 Silicon micro-strip ladders 9 O PU M39        
D3.8 Detectors in 3D available for assessment 3 D PP M40        
D4.2 Follow up structure for the project 4 R PU M40        
D8.5 Installation of tracking telescope 8 R PU M40        
D9.6 Pixel read-out for gaseous detectors 9 O PU M40        
D9.7 Integrated infrastructure for highly granular calorimeters 9 O PU M40        
D3.9 2nd set of macro blocks 3 R PU M44        
D8.6 Detector and detector control system operational 8 R PU M44        
D8.7 Populated data base of components qualification 8 R PU M46        
D8.8 DAQ performance and test beam utilization 8 R PU M46        
D9.8 Infrastructure and utilization 9 R PU M46        
D9.9 Adequation of GEANT-4 simulation of hadronic showers in different media 9 R PU M46        
D1.4 Final plan for use and dissemination of foreground 1 R PU M48        
D1.5 3rd Periodic Report (progress of work, resources, finance) 1 R RE M48        
D1.6 Final Project Report 1 R RE M48        
D3.10 Assessment of 3D integrated sensors 3 R PU M48        
D5.1 Transnational access to DESY test  beam 5 O PU M48        
D6.1 Transnational access to CERN test beams 6 O PU M48        
D6.2 Transnational access to CERN irrad east hall 6 O PU M48        
D7.1 Transnational access to JSI, Slovenia 7 O PU M48        
D7.2 Transnational access to UCL, Belgium 7 O PU M48        
D7.3 Transnational access to KIT, Germany 7 O PU M48        
D8.9 Performance of beamline and infrastructure 8 R PU M48        
D8.10 Commissioning of new facility equipment 8 R PU M48        
D8.11 Infrastructure performance and utilization 8 R PU M48